广州JS论坛一品香_深圳蒲友论坛技师推荐_佛山桑拿0760sn论坛_风楼阁全国信息2025登录入口

Project Managment
Documentation
Quality Assurance
You are here : Home Services Documentation
Shanghai Sanqiang has a competent team of trained specialists who develop customized test plans and qualification protocols in close cooperation with the customer.
All qualification documents are designed in accordance with the cGMP guidelines, DIN EN ISO 9001:2000 international quality standards and recommendations by the FDA.



The design qualification (DQ) is the first step to determine the conditions of the IQ/OQ test and consists of the evaluation of the system design according the User Requirement Specifications (URS).

In case the system is built in our premises a FAT (Factory Acceptance Test), is carried out in the presence of the customer following the qualification protocol produced to guaranteeing correct installation and operation of the equipment.
During the SAT (Site Acceptance Test) the qualification protocol has the objective to verify and confirm the optimum operation of the unit in its final position.
The Installation Qualification (IQ) documents that the machine is installed according to what is specified by the DQ requirements and that all components, which are relevant for the operation of the machine, are present and meet their intended specifications.

Typical areas for IQ testing are:
·   components critical to the process
·   controls systems and loops
·   change parts
·   PC and PLC hardware
·   utility connections
·   loop tests
The operational qualification (OQ) has to prove in detailed tests, that all critical operation parameters are within the defined ranges. All testing is recorded and described in detail:
·   Safety functions
·   Machine functions
·   Operator interface
 
The Performance Qualification (PQ) has to verify that the system performance satisfies all requirements including the critical quality attributes and critical process parameters that have been specified in the URS.PQ is the final step to formally test and document proper performance of the system prior to normal operation.
The entire qualification process is carefully drawn up and documented to provide a complete report, which is easy to navigate and understand.
After the qualification process, a complete technical documentaion is generated, comprised of:
·   Design Calculations and Simulation Output
·   Process Flow Diagram
·   Process and Instrument Diagrams
·   Vessel Drawings and Equipment Specification Sheets
·   Equipment General Arrangements
·   Piping Plan Drawings & Isometrics
·   3-D Model of Entire System
·   Structural Steel Drawings
·   Electrical Drawings and Instrument Package
·   Operating, Maintenance and Installation Manuals
Copyright © 2010 上海三强企业 PRIVATE POLICY
ADD:SOHO Zhongshan Plaza, No. 1065 Zhongshan West Road, Changning District, Block B 305
E-mail:info@shsanqiang.cn ICP:沪ICP备12044785号 TEL: 021-60318600 4001178910
主站蜘蛛池模板: 崇义县| 枝江市| 白朗县| 美姑县| 齐齐哈尔市| 宾阳县| 大埔县| 根河市| 乐平市| 攀枝花市| 稷山县| 象山县| 嘉峪关市| 江都市| 青铜峡市| 大关县| 钦州市| 来凤县| 当阳市| 宜兴市| 吉林省| 乌兰浩特市| 宜良县| 鹤壁市| 石屏县| 桐城市| 赤城县| 海丰县| 金秀| 晋城| 元阳县| 五寨县| 连江县| 武夷山市| 德昌县| 理塘县| 明水县| 德阳市| 景宁| 奉贤区| 巴马|